Line 43: Line 43:
==History==
==History==
===Construction Phase===
===Construction Phase===
Construction of the Charu Wheels began at the start of [[2304]] and was a joined effort primarily between the [[House Olanji]] owned corporations [[Olanji/Charubah]] and [[Charubah Industries]]. However, [[Zion Tech]] contributed with funds from [[2337]] and onward. [[Olanji Mining Guild]] was the primary source of raw materials for the project, which depleted most of [[Jyll]]'s natural resources.
Both of the shipyards were built at the same time, with the B-wheel progressing somewhat faster than the A-wheel. The [[Varno]] race from [[Varn]] contributed with their engineering expertise to make the construction phase progress faster.
The B-wheel was completed in late [[2388]] while the A-wheel was finished in early [[2389]]. Both stations went operational at the same time.
===Operational Phase===
===Operational Phase===
===Inactive Phase===
===Inactive Phase===

Revision as of 17:21, 4 November 2006

Template:Station-Historical The Charu Wheels were two massive, identical and circular shipyard facilities which were located in the Charu system. Between 2389 and 3997 they functioned as the primary production facilities of Olanji/Charubah as the shipyards were capable of producing entire fleets at once.

During the Dark Age and Hapan civil war, the shipyard operated at maximum capacity continuously between 3946 and 3991. House Olanji lost their hold on the Charu system in 3991 and destroyed the Charu Wheels in 3997 at the end of the third battle of Charu in order to cripple the Phoenix Movement's industrial capacity.

History

Construction Phase

Construction of the Charu Wheels began at the start of 2304 and was a joined effort primarily between the House Olanji owned corporations Olanji/Charubah and Charubah Industries. However, Zion Tech contributed with funds from 2337 and onward. Olanji Mining Guild was the primary source of raw materials for the project, which depleted most of Jyll's natural resources.

Both of the shipyards were built at the same time, with the B-wheel progressing somewhat faster than the A-wheel. The Varno race from Varn contributed with their engineering expertise to make the construction phase progress faster.

The B-wheel was completed in late 2388 while the A-wheel was finished in early 2389. Both stations went operational at the same time.

Operational Phase

Inactive Phase

Destruction

Facilities

Olanji/Charubah

Zion Tech

Charubah Industries

Royal Armaments Guild of Charubah

Minor Modules

See Also